Containment barrier systems for boron mining waste tailing dams: "Emet yeni atik baraji" case study
6th Asian Regional Conference on Geosynthetics: Geosynthetics for Infrastructure Development, GA 2016, New Delhi, Hindistan, 8 - 11 Kasım 2016, ss.640-650, (Tam Metin Bildiri)
- Yayın Türü: Bildiri / Tam Metin Bildiri
- Basıldığı Şehir: New Delhi
- Basıldığı Ülke: Hindistan
- Sayfa Sayıları: ss.640-650
- Boğaziçi Üniversitesi Adresli: Evet
Özet
Turkey has extensive boron mineral deposits, which are presently processed in large quantities. Thewastes are typically stored in tailing dams as final disposal options. Eti Maden which is the largest boron mineral producer in Turkey has recently constructed the "Emet Yeni Atik Baraji" (Emet new leachate dam) and lined it with a Geomembrane-GCL barrier system. A natural valley was chosen as the tailing dam location. The lower end of the valley was closed with a rock fill embankment type dam with a clay core inside. The reservoir area and the inside of the dam is coated by a liner system that consisted of a geonet, GCL and a Geomembrane. The surface area of the lined containment system was approximately 300.000 m2. The natural soil in the valley consisted of clays and limestone. Since the limestone is a permeable material and it is interlayered with impermeable clay layers, the water accumulating in the limestone naturally discharges towards the valley. A geonet was necessary to collect and discharge this water from behind the barrier The case study presented in this paper includes the usages of Geosynthetic Clay Liner (GCL) and GCL with Geomembrane as containment barriers for a leachate tailing dam. The nature of mining waste to be stored in the tailing dam in the future was noted to affect the design of the lining system. The construction of the tailing dam has been completed and the project is operational. The details of the construction will also be summarized in the paper.