Concrete wall optimization in use of a large-scale base isolated hospital building


Rokhgar N., GÖĞÜŞ A., Clifton T., Melek M., Chok K.

11th National Conference on Earthquake Engineering 2018: Integrating Science, Engineering, and Policy, NCEE 2018, California, Amerika Birleşik Devletleri, 25 - 29 Haziran 2018, cilt.7, ss.4062-4071, (Tam Metin Bildiri)

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Cilt numarası: 7
  • Basıldığı Şehir: California
  • Basıldığı Ülke: Amerika Birleşik Devletleri
  • Sayfa Sayıları: ss.4062-4071
  • Boğaziçi Üniversitesi Adresli: Hayır

Özet

Located in Istanbul, Turkey, Ikitelli City Hospital will be constructed on a building plot of approximately 1,000,000m2. The building consists of three towers of varying levels ranging from 15 to 18 stories and six clinic buildings of approximately 4 stories above ground. The towers and the clinics share a 5-story podium with approximate plan dimensions of 300m x 400m, which is supported on nearly 2,000 isolators. Lateral load resisting system of the building is concrete core-walls-only, which yields in tremendous quantities of concrete utilization due to the large scale of the project. With the aim to minimize construction costs and to improve floor plan efficiency, a wall optimization study has been undertaken in which two input parameters were considered: (1) number of wall groups to be assigned the same thickness value to, and (2) number of wall thickness values to be considered. The output values of interest were: (1) building fundamental period, (2) shear demands and (3) concrete quantity. The aim was to obtain the most optimized concrete quantity which would provide sufficient lateral stiffness to the base isolated building. Based on the layout of the core walls, nine different wall groups and five different wall thickness values ranging from 400mm to 800mm were considered. Through implementation of some structural requirements (such as wall thickness not getting thicker with increase in wall elevation), a total of number of 180 possible wall thickness layouts were obtained. Individual Strand7 finite element models of the 180 different possibilities were automatically generated and analyzed through use of Grasshopper scripting. Modal analysis results and images as well as the concrete quantity for each of the models were uploaded onto a user-friendly web interface which the client had access to. The optimization study not only helped the client save on concrete quantity, but also enabled.